Through one of our customers in the DCS systems, we have been awarded a contract with OPG (Ontario Power Generation) for their Darlington plant for replacing the controls of the Standby Generator 1 to 4. This contract was spread over a two year period and required beforehand a field visit to measure the existing enclosures, since we had to replace the front doors and the internal controls. We also were requested to comply with the CSA Z299.3 standard.